Project/Activity/Location |
Service rendered by SCE |
Year of Award |
In Salah Phase I - On Shore Gas Facility Expansion, Algeria |
SIL study (LOPA), SIL Verification |
2008 |
Karachaganak Ph-1 Development, On Shore Gas Facility, Kazakhstan |
SIL study (Risk graph), SIL Verification |
2008 |
Off shore Oil & Gas, Brazil |
SIL study (LOPA) |
2008 |
Ammonia Unit Modification, Fertilizer, UAE |
SIL study (LOPA) |
2008 |
On Shore Gas Well head Production Facility, Pakistan |
SIL study (LOPA), SRS, SIL Verification, Test Procedures |
2008 |
Jihar Phase-3, On Shore Gas Facility, Syria |
SIL study (LOPA), SIL Verification |
2008 |
EBLA Gas Project, Surface Facility, Syria |
SIL Verification |
2008 |
ESD System Reliability &Availability Study, ADMA-OPCO |
SIL study (LOPA),SRS, SIL Verification, Test Procedures |
2008 |
Reshadat Offshore Field development, Iran |
SIL Verification |
2008 |
Hasdrubal Onshore Gas Terminal Modification, Tunisia |
SIL Verification |
2008 |
Asab, Bab, Bu Hasa and Ruwais Modifications, GASCO, Abu Dhabi |
Shell RRM 1.51 SIL Study |
2008 |
Gas Pipeline project, GASCO Abu Dhabi |
SIL Verification |
2009 |
SGC Gas Plant Modification, Syria |
SIL study (Risk graph) |
2009 |
OAG Project EPC-3, GASCO, Abu Dhabi |
SIL Verification |
2009 |
Refinery / Isomerate quality improvement Pjt., Abu Dhabi |
SIL Study (LOPA), SRS |
2009 |
Booster station BS-160; Process and F&G, Kuwait |
SIL study (Risk graph) |
2009 |
ASAB Field Development Project, Abu Dhabi |
SIL study (LOPA), SRS, SIL Verification, Validation, Test Procedures |
2009 |
Offshore Oil Facility (ZWSC 100MBD modification FEED), Abu Dhabi |
SIL study (LOPA) |
2009 |
On shore Oil Facility GC-17, Kuwait |
SIL study (LOPA), SRS, SIL Verification |
2009 |
On Shore Oil Facility - Oil, Condensate, LPG, Re-Injection and Export facilities with packages, El-merk, Algeria |
SIL study (Risk Graph), SIL Verification |
2010 |
On Shore Oil Facility Modification, Karan, KSA |
SIL study (Risk Graph) |
2010 |
BS 170 Fire and Gas System, Kuwait |
SIL Study (F&G), SRS, SIL Verification |
2010 |
Kauther On-shore Field Development, Oman |
SIL Verification |
2010 |
Majnoon Green field Project,Iraq |
SIL Assessment (SIFPRO), SRS, Design |
2010 |
Majnoon Oil Field On shore facility, Iraq |
SIL Assessment (SIFPRO), SRS, Design |
2013 |
ESP on WHP 07 & 015, Offshore facility, UAE |
SIL study (LOPA), SIL Verification |
2010 |
Gas Sweetening Facilities In Messaied And Dukhan (SRU Upgrade And AGRU), Qatar |
SIL Verification |
2010 |
Jaliha Development Project, UAE |
SIL Study (Riskgraph), SIL Verification |
2010 |
Wellhead Control System, KSA |
SIL Verification |
2011 |
South Yolouten gas Development project, Turkmenistan |
SIL study (LOPA), SIL Verification, FSA |
2011 |
Pressure Reduction Station, UAE |
Failure Mode Effects and Criticality Analysis (FMECA) |
2011 |
Replacement of Refrigeration System,Buhasa, UAE |
SIL Study (Riskgraph), SIL Verification |
2011 |
Training |
IEC 61511 Life Cycle Training |
2011 |
Crude oil loading facility, Abu Dhabi |
SIL study (LOPA) |
2011 |
FEED for Automation upgrade, Qatar |
SIL study (LOPA) |
2011 |
Flares modification/revamp projects, UAE |
SIL study (LOPA) |
2011 |
In Salah Gas Southeren Field Development Project, Algeria |
SIL study (LOPA), SRS, SIL Verification, Test Procedures |
2011 |
Flash Gas Recovery Project, Dubai |
SIL Study (Riskgraph), SIL Verification |
2011 |
Dolphin Plant Modifications, Qatar |
SIL Verification |
2011 |
QP Pipeline Expansion, Qatar |
SIL Study (Riskgraph), SRS, SIL Veriifcation |
2011 |
Refinery Expansion, Iraq |
SIL study (LOPA) |
2011 |
Crude oil loading facility, Qatar |
SIL Study (Riskgraph), SIL Verification |
2012 |
Pure NGI, UAE |
SIL Assessment (SIFPRO), SRS&Design |
2012 |
Training |
Life Cycle - 7 batches Training |
2011 |
Training |
Life Cycle - 3 batches Training |
2012 |
Central Processing Facilities Phase I Production Infrastructure Badra Oil Field Project, IRAQ |
SIL Study - LOPA, SIL Verification |
2012 |
100 MBD DAS Facilities Upgrade Project Scope “B”, UAE |
SIL Study - LOPA |
2012 |
De-bottlenecking project: HIPPS Reliability study, AGP,UAE |
Fault Tree Analysis |
2012 |
NGI Pure Case Project, UAE |
SIL Assessment (SIFPRO), SRS, Design |
2012 |
ADA Aviation Fuel Depot, Takreer, UAE |
SIL Study - LOPA |
2012 |
Produced Water Treatment facility, Zirku Island, UAE |
SIL Study - LOPA |
2012 |
UMM Shaif Oil Network Project, UAE |
SIL Study - LOPA, SIL Verification |
2013 |
Laggan - Tormore Project, UK |
FSA |
2013 |
Rabigh Phase II Tank Farm and Common Utilities, Aramco, KSA |
SIL Study, Risk Graph, SRS, SIL Verification |
2013 |
EMAL PRS De-Bottlenecking, UAE |
HAID, HAZOP, Failure Mode and Effects Analysis (FMEA) |
2013 |
Hammar Mishrif, Basra, Iraq |
SIL Assessment (SIFPRO), SRS&Design |
2013 |
NGL Pipeline replacement -ASAB, UAE |
SIL Assessment (SIFPRO), SRS&Design |
2013 |
TB3/6 Reliability Studies, Abu Dhabi |
Reliability Study, Fault Tree Analysis, Developing SIF Test Procedures |
2013 |
IGD-HAP ESD System Test Procedures |
Developing SIF Test Procedures |
2013 |
Gasco Dry Gas Seal (DGS) Retrofit Project, UAE |
SIL-LOPA (SIFPRO) |
2013 |
ADGAS FEED for 9th Power Generation Project, UAE |
SIL Study (ABB TRAC) |
2013 |
Rafidiya Compressor Modification, Shell- Iraq |
SIL Study (SIFPRO) |
2013 |
Basra Gas Company, Service Jetty Refurbishment, Iraq |
SIL Study (SIFPRO) |
2013 |
Bunduq Water Disposal system, UAE |
SIL- MS Access |
2013 |
HIPPS Reliability Analysis, UAE |
Fault Tree Analysis (FTA) |
2013 |
ADCO BAB Habshan Field Development, UAE |
SIL- LOPA |
2013 |
ADIP Abosrber and Regen system,GASCO, UAE |
SIL Assessment (SIFPRO), SRS, Design |
2013 |
ADCO BAB Compression project, UAE |
SIL- LOPA ExSILentia |
2013 |
Labix Linear Alkyl Benzene Project, Thailand |
SIL Assessment (SIFPRO), SRS, Design |
2013 |
Upgrade of Power generation system, ZADCO, UAE |
SIL- LOPA |
2013 |
BGC LQ Modification Project. Iraq |
SIL Assessment (SIFPRO), SRS, Design |
2014 |
LG-8 Power Generation, ADGAS UAE |
SIL- LOPA |
2014 |
Replacement Of Obsolete PLC & Field Termination For 91C101 & 92C101 Booster Compressor, UAE |
SIL Assessment (SIFPRO), SRS, Design |
2014 |
Intergrated Petrochemical and Infrastructure Project Phase -2 Khazakhstan |
SIL- LOPA ExSILentia |
2014 |
Umm Lulu Full Field Development, UAE |
SIL- LOPA, SRS, SIL Veriifcation |
2014 |
ChemaWEyaat Utilities & Offsites, UAE |
SIL- LOPA MS Access |
2014 |
Upper Zakum 750- Islands Surface Facilities Project, UAE |
SIL- LOPA ExSILentia |
2014 |
TOP SPP 217MW Power Producer Project, Thailand |
SIL Assessment (SIFPRO), SRS&Design |
2014 |
Borouge PE3 Revamp Project, UAE |
SIL-Risk Graph, Verification |
2014 |
Test Procedure Development for off shore SIS/SIFs, UAE |
SIF Test Procedures, Validation |
2014 |
Allen bradely F&G PLC replacement project, GASCO, UAE |
HAZID |
2014 |
EPC Works for EZ16E, ADMA OPCO UAE |
SIL F&G (Event Tree Analysis) and ESD |
2014 |
Replacement of AB Package PLCs and associated Field Instrumentation for Train 1, 2 & 3 of Habshan 1, UAE |
SIL (SIFPro) |
2014 |
Umm Lulu Field Development Phase-2 Project, UAE |
SIL -ESD & FGS |
2014 |
ASAB & BuHASA Gas Turbine Replacement Phase - 1 Project, UAE |
SIL (SIFPro) |
2014 |
Badra Oil Filed CPF Phase-II, Iran |
SIL -Verification |
2014 |
Wet Crude Treatmet System, West Qurna |
SIL -ESD |
2015 |
HABSHAN Direct Depressurisation (HDD) GASCO-ADCO interface, UAE |
SSIL -ESD , Alarm Rationalisation |
2015 |
Al Nasr Field Development Phase -1 , UAE |
SIL -ESD & F&G (Event Tree Analysis) |
2015 |
Sohar Refinery Improvement Project SRIP, ORPIC, Oman |
Alarm Management Study |
2015 |
COS Tank Overfill Protection, UAE |
SIL Verification |
2015 |
HIPPS system Relianility Study, Aramco, KSA |
SIL Verification |
2015 |
ADCO A~ Dabbiya Surface Facilities Phase-III Project |
SIL Study, SRS, Design |
2015 |
Gas Development Expansion Package1 Project (IGD-E1) Das Island, UAE |
SIL Study |
2015 |
C02 Recovery and Injection project, UAE |
SIL Study |
2015 |
Al Yasat & Al Dhafra Offshore Field Deveopment, UAE |
SIL Study |
2015 |
Furnace Modifications Train-1/2 Habshan, UAE |
SIL Study, SRS, Design |
2016 |
CO2 Recovery & Injection (CRI) from Habshan- 4 Project, UAE |
SIL Study |
2016 |
Al Nasr Field Development Phase -2, UAE |
SIL Study & Verification |
2016 |
Umm lulu Development Project -WHT-4,6, UAE |
SIL Study & Verification |
2016 |
ESD/ HIPPS SIL Study & Certification, Aramco, KSA |
SIL Study & Certification |
2016 |
Taweelah Compression package, UAE |
SIL Study |
2016 |
Bu Haseer SIL Study, UAE |
SIL Study |
2016 |
Fadhili Field Development, Saudi Aramco, KSA |
SRS |
2016 |
Jurassic Production Facility, Sabriya, Kuwait |
SIL study |
2017 |
Taweela Compression Project - Vendor packages, UAE |
SIL study |
2017 |
Al Yasat Offshore field development - Buhaseer FFD, UAE |
SIL study |
2017 |
Al Nazar temporary Jumpover |
SIL study |
2017 |
Khubai II Pipeline project, UAE |
SIL study |
2017 |
Replacement of Boiler-A in EU2, Borouge-2, Abu Dhabi |
SIL study |
2017 |
Crude oil export from Zirku to Onshore, Abu Dhabi |
SIL study |
2017 |
GTG Project, Abu Dhabi |
SIL study |
2017 |
Cherouq facilities, Tunisia |
SIL Verification |
2017 |
New 3rd Instrument Air Comp. Pkg, Abu Dhabi |
SIL Study |
2017 |
GTG Project, Abu Dhabi |
SIL Study |
2017 |
ASAB-1 Control Systems Upgrade, Abu Dhabi |
SIL Study |
2017 |
LPG Extraction and Fractionation Plant at Salalah, Oman |
SIL Study |
2018 |
Damman Decentralised Water Injection Facilities, WQ II, IRAQ |
SIL Study |
2018 |
NAG LTFD 3 Khuff Wells Surface Facilities Project, Bahrain |
Alarm Rationalisation |
2018 |
IGD Expansion (Package 1) at Das Island, Abu Dhabi |
SIL Validation, FSA |
2018 |
ESD / WSD - Gas Modular Skid, KSA |
SIL Verification & Certification |
2018 |
BAB Integrated Facilities Project, Abu Dhabi |
SIL Study, SRS, Verification & Validation |
2018 |
Sakalin OPF Compression project, Russia |
Alarm management Study |
2018 |
Light Porduct Truck Loading Rack, ZARQA Refinery, Iraq |
SIL Study |
2018 |
BMS Modification at Takreer, Abu Dhabi |
SIL Study |
2018 |
KOC Water management project, Kuwait |
SIL Study |
2018 |
HALIBA Field Development Project, Abu Dhabi |
SIL Study |
2018 |
UA-750 EPC-3 Project, Abu Dhabi |
SIL Verifcation |
2018 |
Dalma Gas Development Project, Abu Dhabi |
SIL Study |
2018 |
ASAB-1 CSU Project, Abu Dhabi |
SIL Study |
2019 |
Bu Haseer FFD Project, Abu Dhabi |
SIL Study |
2018 |
Qusahwira Phase-2, Abu Dhabi |
SIL Study, SRS , Verification |
2018 |
HAIL Full Field Development Project, Abu Dhabi |
SIL Study |
2018 |
Turkstream Gas Pipeline Project, Turkey |
SIL Verification |
2018 |
EPC for interconnecting feed to CSU in ASAB-1 plant |
SIL Validation |
2018 |
Water management project, Kuwait |
SIL Study |
2018 |
KRI Sarta Stage-1A EPF project, Iraq |
SIL Study |
2019 |
Associated Gas Capture, Phase-1C Basra, Iraq |
SIL Study |
2019 |
Wellhead HIPPS, KSA |
SIL Verification |
2019 |
Thai Oil refinery - Clean Fuel Project, Thailand |
SIL Study |
2019 |
Majnoon CPF-2, Iraq |
SIL Verification & Alarm Rationalisation |
2019 |
Habshan-5 de-bottlenecking for Associated Gas |
SIL Study |
2019 |
Surface Production Facilities, OCS and GGS, OIL, India |
SIL Study |
2019 |
ASAB-1 Control Systems Upgrade Project, Abu Dhabi |
SIL Validation |
2019 |
IGD Expansion, Phase-2, Abu Dhabi |
SIL Study |
2019 |
PGP Facilities, Pesh Kbir, Iraq |
SIL Verification |
2019 |
ADOC Hail Field development, Abu Dhabi |
SIL Study |
2019 |
DEWA Hydrogen Project, Dubai |
SIL Study |
2019 |
Offshore field development, Abu Dhabi |
SIL Study |
2019 |
Habshan Cooling Sea Water project, Abu Dhabi |
SIL Study |
2019 |
Fujairah, Tank farm terminal |
SIL Study |
2019 |
SATORP, Saudi ARAMCO |
SIL Study Verification & SRS |
2019 |
Habshan 5 BMS upgrade, Abu Dhabi |
SIL Study Verification & SRS |
2020 |
Umm Al Dalkh addition of ESPs, Abu Dhabi |
SIL Study |
2020 |
ADONOC offshore - AL NASR Project , Abu Dhabi |
SIL Validation |
2020 |
Chevron Iraq Project, Iraq |
SIL Verification |
2020 |
KOC Desalter Project, Kuwait |
SIL Study |
2020 |
HAZOP Study - Cyclohexene Process Plant, Abu Dhabi |
HAZOP and SIL Study |
2020 |
SNOC - Moveyeid Gas Storage Surface Facility Project (Phase-2), Sharjah |
FGS Mapping Study |
2020 |
Habshan 5 Debottlenecking Project, Abu Dhabi |
SIL Study |
2020 |
Bu-Hasa Debottlenecking Project, Abu Dhabi |
SIL Study |
2020 |
Satah Compressor package, Abu Dhabi |
SIL Study |
2019 |
485 MBD Modification - BIFP, ADNOC Onshore, Abu Dhabi |
SIL Verification, Alarm Rationalisation |
2021 |
Diyab Upstream Project |
SIL Verification |
2020 |
SADAD, Oman |
FSA and SIL Validation |
2020 |
NASR 85 MBD Project, Abu Dhabi |
SIL Lifecycle Study -ESD and F&G (Event Tree Analysis) |
2020 |
ADNOC LNG Project |
SIL Study |
2020 |
Shah Sour Gas Field, Shah Gas Plant, ASG, Abu Dhabi |
Revalidation HAZOP &SIL |
2020 |
Bul Hanine (BH) oil field Re-Development, Qatar |
SIL Validation |
2020 |
Amine Sweetening Unit, GORU B Facility, Pakistan |
SIL Study |
2020 |
Shah Sour Gas Field, Shah Gas Plant, ASG, Abu Dhabi |
Alarm Rationalisation |
2021 |
P4 Plant FEED Project, Borouge, Abu Dhabi |
SIL and LOPA Study |
2021 |
Sulphur Handling RSHT, AGP, Abu Dhabi |
SIL Study - SIFPRO |
2021 |
AL NASR - FFD SIL Validation, UAE |
SIL Validation |
2021 |
ILF Boiler Pkgs AGP, UAE |
SIL Study - SIFPRO |
2021 |
Flare Gas Recovery - Habshan, UAE |
SIL Study - SIFPRO |
2021 |
Sales Gas Pipeline network enhancement, AGP, UAE |
SIL Study - SIFPRO |
2021 |
Habshan 0 Boiler Upgrade Project, UAE |
SIL Study - SIFPRO |
2021 |
LPG Import, Backflow & Loading Lines Replacement Project, SNOC, UAE |
SIL Study |
2021 |
UAD ESP Early Production Scheme, UAE |
SIL - Life cycle studies |
2021 |
Thamama F Trunklines-EPC Phase, UAE |
SIL Verification |
2021 |
Metering Packages, UAE |
SIL Study |
2021 |
Habshan 5 Pipeline Integrity Upgrade, AGP, UAE |
SIL Study |
2021 |
Balbazem Field Development, UAE |
SIL Study |
2021 |
Al Dhafra metering package, UAE |
SIL Study |
2022 |
Rumaila Project - Trunk Lines & Manifolds, Iraq |
SIL Study |
2022 |
RO DM Plant with ZLD & CPU- Petrochemical and Lube Integration Project “LuPech” (J-18)”, IOCL Gujarat Refinery, India |
SIL Study & Verification |
2022 |
Ruwais Capaity Enhancement of NGL Trains-1,2,3&4, UAE |
SIL Study and Verification |
2022 |
Upgrade of Existing Taweelah Gas Compressor Plant, UAE |
SIL Study and Verification |
2022 |
Jurassic Process Facility (JPF-5), Kuwait |
SIL Study |
2022 |
Safety Studies-Al Shaheen Field, Qatar |
SRS Development |
2022 |
Sour Gas Treatment Plant, Majnoon, Iraq |
SRS Development & SIL Verification |
2022 |
NCF-1 & 2 Modification, Tatweer, Bharain |
SIL Verification & SRS |
2022 |