SCE References

  • CONTACT US
Validation
  • Project/Activity/Location Service rendered by SCE Year of Award
    Onshore GTL Facility, Qatar HAZOP for modifications, SIL (LOPA) 2009
    Refinery/ Isomerate quality improvement HAZOP – Isomerate quality improvement 2009
    Hasdrubal Onshore Gas Terminal Modification HAZOP - Modifications, SIL Study (LOPA) 2009
    Betex and Mercury removal project, On-shore facility HAZOP 2010
    DUSUP Plant Modifications HAZOP 2011
    Shuweihat Phase 3 gas supply HAZID and HAZOP 2012
    Crude Oil loading facility HAZOP and SIL 2012
    Caustic Treatment Plant, Abu Dhabi Refinery HAZOP, SIL Study 2012
    Replacement of MV &LV Switchgear, Habshan E-HAZID 2012
    EMAL PRS De-Bottlenecking HAID, HAZOP, Failure Mode and Effects Analysis (FMEA) 2013
    Refrigeration Compressor HAZOP/LOPA (PHA PRO8) 2013
    LEC III Conversion, Habshan HAZOP/SIL 2013
    SARB Project Package III HAZOP 2013
    Allen bradely F&G PLC replacement project HAZID 2014
    Mix C4s Export Facility Project to Borouge HAZOP and SIL 2014
    Upper Zakum 750- Islands Surface Facilities Project HAZOP 2014
    OMGP Plant, Hyundai Engineering Co. HAZOP 2014
    Ruwais LNG Terminal Modification HAZOP & SIL -ESD 2015
    ESP Topside Facilities, ZADCO HAZOP 2015
    Enhancement of Oil Recovery from Closed Drain Systems, WWTP,ADCO HAZOP 2015
    Wet Crude Treatment System, Hot Oil Fired Heaters Package Exxon Mobil HAZOP, SIL 2015
    HALIBA Field Development Project, Abu Dhabi HAZOP 2015
    ADCO AI Dabbiya Surface Facilities Phase-3 Project HAZOP & SIL 2016
    SRP, EPC-III, ZADCO, Abu Dhabi HAZOP and SIL Study 2017
    Satah FFD - GI Compressor, Abu Dhabi HAZOP and SIL study 2017
    M Project, abu Dhabi HAZOP and SIL Study 2018
    Feeder to Primary impact Crusher and Vibrating Screen, Abu Dhabi HAZOP Study 2018
    Improvement of Mussafah Terminal Fire Fighting Facilities, Takreer, Abu Dhabi HAZOP and SIL Study 2019
    KOC PHA Project Re validation, Kuwait HAZOP/SIL/CHAZOP 2019
    Bu Hasa Integrated Field Development, Abu Dhabi HAZOP and SIL Study 2019
    FEED and EPC competetion, Belbazem Block Development Project HAZOP & SIL Study 2019
    Garraf Field Development Project, Iraq HAZOP & SIL Studies 2019
    1MMBD Expansion, Phase-1 UZ, Abu Dhabi HAZOP-SIL study 2019
    Moveyeid Gas Storage Surface Facility Project (Phase-2), Sharjah HAZID,HAZOP,SIL, PHSER 2020
    Habshan 4 CO2 Recovery, Abu Dhabi HAZOP and SIL Study 2020
    HAZOP Study - Cyclohexene Process Plant, Abu Dhabi HAZOP and SIL Study 2020
    New Fuel Gas System, Dubai HAZOP Study 2019
    CO2 Removal, Schlumberger, UAE HAZOP 2020
    Shah Sour Gas Field, Shah Gas Plant, ASG Revalidation HAZOP_SIL 2020
    Bisat Production Facility (BISAT-C) Project HAZOP/SIL Study 2020
    Bulk Liquid Storage Terminal, Jebel Ali Freezone, Start Energy Oil Tanking, DUBAI HAZOP & LOPA 2021
    Maximising Ethane Reovery and Monetisation (MERAM) HAZOP, SIL Study 2022
  • Project/Activity/Location Service rendered by SCE Year of Award
    In Salah Phase I - On Shore Gas Facility Expansion, Algeria SIL study (LOPA), SIL Verification 2008
    Karachaganak Ph-1 Development, On Shore Gas Facility, Kazakhstan SIL study (Risk graph), SIL Verification 2008
    Off shore Oil & Gas, Brazil SIL study (LOPA) 2008
    Ammonia Unit Modification, Fertilizer, UAE SIL study (LOPA) 2008
    On Shore Gas Well head Production Facility, Pakistan SIL study (LOPA), SRS, SIL Verification, Test Procedures 2008
    Jihar Phase-3, On Shore Gas Facility, Syria SIL study (LOPA), SIL Verification 2008
    EBLA Gas Project, Surface Facility, Syria SIL Verification 2008
    ESD System Reliability &Availability Study, ADMA-OPCO SIL study (LOPA),SRS, SIL Verification, Test Procedures 2008
    Reshadat Offshore Field development, Iran SIL Verification 2008
    Hasdrubal Onshore Gas Terminal Modification, Tunisia SIL Verification 2008
    Asab, Bab, Bu Hasa and Ruwais Modifications, GASCO, Abu Dhabi Shell RRM 1.51 SIL Study 2008
    Gas Pipeline project, GASCO Abu Dhabi SIL Verification 2009
    SGC Gas Plant Modification, Syria SIL study (Risk graph) 2009
    OAG Project EPC-3, GASCO, Abu Dhabi SIL Verification 2009
    Refinery / Isomerate quality improvement Pjt., Abu Dhabi SIL Study (LOPA), SRS 2009
    Booster station BS-160; Process and F&G, Kuwait SIL study (Risk graph) 2009
    ASAB Field Development Project, Abu Dhabi SIL study (LOPA), SRS, SIL Verification, Validation, Test Procedures 2009
    Offshore Oil Facility (ZWSC 100MBD modification FEED), Abu Dhabi SIL study (LOPA) 2009
    On shore Oil Facility GC-17, Kuwait SIL study (LOPA), SRS, SIL Verification 2009
    On Shore Oil Facility - Oil, Condensate, LPG, Re-Injection and Export facilities with packages, El-merk, Algeria SIL study (Risk Graph), SIL Verification 2010
    On Shore Oil Facility Modification, Karan, KSA SIL study (Risk Graph) 2010
    BS 170 Fire and Gas System, Kuwait SIL Study (F&G), SRS, SIL Verification 2010
    Kauther On-shore Field Development, Oman SIL Verification 2010
    Majnoon Green field Project,Iraq SIL Assessment (SIFPRO), SRS, Design 2010
    Majnoon Oil Field On shore facility, Iraq SIL Assessment (SIFPRO), SRS, Design 2013
    ESP on WHP 07 & 015, Offshore facility, UAE SIL study (LOPA), SIL Verification 2010
    Gas Sweetening Facilities In Messaied And Dukhan (SRU Upgrade And AGRU), Qatar SIL Verification 2010
    Jaliha Development Project, UAE SIL Study (Riskgraph), SIL Verification 2010
    Wellhead Control System, KSA SIL Verification 2011
    South Yolouten gas Development project, Turkmenistan SIL study (LOPA), SIL Verification, FSA 2011
    Pressure Reduction Station, UAE Failure Mode Effects and Criticality Analysis (FMECA) 2011
    Replacement of Refrigeration System,Buhasa, UAE SIL Study (Riskgraph), SIL Verification 2011
    Training IEC 61511 Life Cycle Training 2011
    Crude oil loading facility, Abu Dhabi SIL study (LOPA) 2011
    FEED for Automation upgrade, Qatar SIL study (LOPA) 2011
    Flares modification/revamp projects, UAE SIL study (LOPA) 2011
    In Salah Gas Southeren Field Development Project, Algeria SIL study (LOPA), SRS, SIL Verification, Test Procedures 2011
    Flash Gas Recovery Project, Dubai SIL Study (Riskgraph), SIL Verification 2011
    Dolphin Plant Modifications, Qatar SIL Verification 2011
    QP Pipeline Expansion, Qatar SIL Study (Riskgraph), SRS, SIL Veriifcation 2011
    Refinery Expansion, Iraq SIL study (LOPA) 2011
    Crude oil loading facility, Qatar SIL Study (Riskgraph), SIL Verification 2012
    Pure NGI, UAE SIL Assessment (SIFPRO), SRS&Design 2012
    Training Life Cycle - 7 batches Training 2011
    Training Life Cycle - 3 batches Training 2012
    Central Processing Facilities Phase I Production Infrastructure Badra Oil Field Project, IRAQ SIL Study - LOPA, SIL Verification 2012
    100 MBD DAS Facilities Upgrade Project Scope “B”, UAE SIL Study - LOPA 2012
    De-bottlenecking project: HIPPS Reliability study, AGP,UAE Fault Tree Analysis 2012
    NGI Pure Case Project, UAE SIL Assessment (SIFPRO), SRS, Design 2012
    ADA Aviation Fuel Depot, Takreer, UAE SIL Study - LOPA 2012
    Produced Water Treatment facility, Zirku Island, UAE SIL Study - LOPA 2012
    UMM Shaif Oil Network Project, UAE SIL Study - LOPA, SIL Verification 2013
    Laggan - Tormore Project, UK FSA 2013
    Rabigh Phase II Tank Farm and Common Utilities, Aramco, KSA SIL Study, Risk Graph, SRS, SIL Verification 2013
    EMAL PRS De-Bottlenecking, UAE HAID, HAZOP, Failure Mode and Effects Analysis (FMEA) 2013
    Hammar Mishrif, Basra, Iraq SIL Assessment (SIFPRO), SRS&Design 2013
    NGL Pipeline replacement -ASAB, UAE SIL Assessment (SIFPRO), SRS&Design 2013
    TB3/6 Reliability Studies, Abu Dhabi Reliability Study, Fault Tree Analysis, Developing SIF Test Procedures 2013
    IGD-HAP ESD System Test Procedures Developing SIF Test Procedures 2013
    Gasco Dry Gas Seal (DGS) Retrofit Project, UAE SIL-LOPA (SIFPRO) 2013
    ADGAS FEED for 9th Power Generation Project, UAE SIL Study (ABB TRAC) 2013
    Rafidiya Compressor Modification, Shell- Iraq SIL Study (SIFPRO) 2013
    Basra Gas Company, Service Jetty Refurbishment, Iraq SIL Study (SIFPRO) 2013
    Bunduq Water Disposal system, UAE SIL- MS Access 2013
    HIPPS Reliability Analysis, UAE Fault Tree Analysis (FTA) 2013
    ADCO BAB Habshan Field Development, UAE SIL- LOPA 2013
    ADIP Abosrber and Regen system,GASCO, UAE SIL Assessment (SIFPRO), SRS, Design 2013
    ADCO BAB Compression project, UAE SIL- LOPA ExSILentia 2013
    Labix Linear Alkyl Benzene Project, Thailand SIL Assessment (SIFPRO), SRS, Design 2013
    Upgrade of Power generation system, ZADCO, UAE SIL- LOPA 2013
    BGC LQ Modification Project. Iraq SIL Assessment (SIFPRO), SRS, Design 2014
    LG-8 Power Generation, ADGAS UAE SIL- LOPA 2014
    Replacement Of Obsolete PLC & Field Termination For 91C101 & 92C101 Booster Compressor, UAE SIL Assessment (SIFPRO), SRS, Design 2014
    Intergrated Petrochemical and Infrastructure Project Phase -2 Khazakhstan SIL- LOPA ExSILentia 2014
    Umm Lulu Full Field Development, UAE SIL- LOPA, SRS, SIL Veriifcation 2014
    ChemaWEyaat Utilities & Offsites, UAE SIL- LOPA MS Access 2014
    Upper Zakum 750- Islands Surface Facilities Project, UAE SIL- LOPA ExSILentia 2014
    TOP SPP 217MW Power Producer Project, Thailand SIL Assessment (SIFPRO), SRS&Design 2014
    Borouge PE3 Revamp Project, UAE SIL-Risk Graph, Verification 2014
    Test Procedure Development for off shore SIS/SIFs, UAE SIF Test Procedures, Validation 2014
    Allen bradely F&G PLC replacement project, GASCO, UAE HAZID 2014
    EPC Works for EZ16E, ADMA OPCO UAE SIL F&G (Event Tree Analysis) and ESD 2014
    Replacement of AB Package PLCs and associated Field Instrumentation for Train 1, 2 & 3 of Habshan 1, UAE SIL (SIFPro) 2014
    Umm Lulu Field Development Phase-2 Project, UAE SIL -ESD & FGS 2014
    ASAB & BuHASA Gas Turbine Replacement Phase - 1 Project, UAE SIL (SIFPro) 2014
    Badra Oil Filed CPF Phase-II, Iran SIL -Verification 2014
    Wet Crude Treatmet System, West Qurna SIL -ESD 2015
    HABSHAN Direct Depressurisation (HDD) GASCO-ADCO interface, UAE SSIL -ESD , Alarm Rationalisation 2015
    Al Nasr Field Development Phase -1 , UAE SIL -ESD & F&G (Event Tree Analysis) 2015
    Sohar Refinery Improvement Project SRIP, ORPIC, Oman Alarm Management Study 2015
    COS Tank Overfill Protection, UAE SIL Verification 2015
    HIPPS system Relianility Study, Aramco, KSA SIL Verification 2015
    ADCO A~ Dabbiya Surface Facilities Phase-III Project SIL Study, SRS, Design 2015
    Gas Development Expansion Package1 Project (IGD-E1) Das Island, UAE SIL Study 2015
    C02 Recovery and Injection project, UAE SIL Study 2015
    Al Yasat & Al Dhafra Offshore Field Deveopment, UAE SIL Study 2015
    Furnace Modifications Train-1/2 Habshan, UAE SIL Study, SRS, Design 2016
    CO2 Recovery & Injection (CRI) from Habshan- 4 Project, UAE SIL Study 2016
    Al Nasr Field Development Phase -2, UAE SIL Study & Verification 2016
    Umm lulu Development Project -WHT-4,6, UAE SIL Study & Verification 2016
    ESD/ HIPPS SIL Study & Certification, Aramco, KSA SIL Study & Certification 2016
    Taweelah Compression package, UAE SIL Study 2016
    Bu Haseer SIL Study, UAE SIL Study 2016
    Fadhili Field Development, Saudi Aramco, KSA SRS 2016
    Jurassic Production Facility, Sabriya, Kuwait SIL study 2017
    Taweela Compression Project - Vendor packages, UAE SIL study 2017
    Al Yasat Offshore field development - Buhaseer FFD, UAE SIL study 2017
    Al Nazar temporary Jumpover SIL study 2017
    Khubai II Pipeline project, UAE SIL study 2017
    Replacement of Boiler-A in EU2, Borouge-2, Abu Dhabi SIL study 2017
    Crude oil export from Zirku to Onshore, Abu Dhabi SIL study 2017
    GTG Project, Abu Dhabi SIL study 2017
    Cherouq facilities, Tunisia SIL Verification 2017
    New 3rd Instrument Air Comp. Pkg, Abu Dhabi SIL Study 2017
    GTG Project, Abu Dhabi SIL Study 2017
    ASAB-1 Control Systems Upgrade, Abu Dhabi SIL Study 2017
    LPG Extraction and Fractionation Plant at Salalah, Oman SIL Study 2018
    Damman Decentralised Water Injection Facilities, WQ II, IRAQ SIL Study 2018
    NAG LTFD 3 Khuff Wells Surface Facilities Project, Bahrain Alarm Rationalisation 2018
    IGD Expansion (Package 1) at Das Island, Abu Dhabi SIL Validation, FSA 2018
    ESD / WSD - Gas Modular Skid, KSA SIL Verification & Certification 2018
    BAB Integrated Facilities Project, Abu Dhabi SIL Study, SRS, Verification & Validation 2018
    Sakalin OPF Compression project, Russia Alarm management Study 2018
    Light Porduct Truck Loading Rack, ZARQA Refinery, Iraq SIL Study 2018
    BMS Modification at Takreer, Abu Dhabi SIL Study 2018
    KOC Water management project, Kuwait SIL Study 2018
    HALIBA Field Development Project, Abu Dhabi SIL Study 2018
    UA-750 EPC-3 Project, Abu Dhabi SIL Verifcation 2018
    Dalma Gas Development Project, Abu Dhabi SIL Study 2018
    ASAB-1 CSU Project, Abu Dhabi SIL Study 2019
    Bu Haseer FFD Project, Abu Dhabi SIL Study 2018
    Qusahwira Phase-2, Abu Dhabi SIL Study, SRS , Verification 2018
    HAIL Full Field Development Project, Abu Dhabi SIL Study 2018
    Turkstream Gas Pipeline Project, Turkey SIL Verification 2018
    EPC for interconnecting feed to CSU in ASAB-1 plant SIL Validation 2018
    Water management project, Kuwait SIL Study 2018
    KRI Sarta Stage-1A EPF project, Iraq SIL Study 2019
    Associated Gas Capture, Phase-1C Basra, Iraq SIL Study 2019
    Wellhead HIPPS, KSA SIL Verification 2019
    Thai Oil refinery - Clean Fuel Project, Thailand SIL Study 2019
    Majnoon CPF-2, Iraq SIL Verification & Alarm Rationalisation 2019
    Habshan-5 de-bottlenecking for Associated Gas SIL Study 2019
    Surface Production Facilities, OCS and GGS, OIL, India SIL Study 2019
    ASAB-1 Control Systems Upgrade Project, Abu Dhabi SIL Validation 2019
    IGD Expansion, Phase-2, Abu Dhabi SIL Study 2019
    PGP Facilities, Pesh Kbir, Iraq SIL Verification 2019
    ADOC Hail Field development, Abu Dhabi SIL Study 2019
    DEWA Hydrogen Project, Dubai SIL Study 2019
    Offshore field development, Abu Dhabi SIL Study 2019
    Habshan Cooling Sea Water project, Abu Dhabi SIL Study 2019
    Fujairah, Tank farm terminal SIL Study 2019
    SATORP, Saudi ARAMCO SIL Study Verification & SRS 2019
    Habshan 5 BMS upgrade, Abu Dhabi SIL Study Verification & SRS 2020
    Umm Al Dalkh addition of ESPs, Abu Dhabi SIL Study 2020
    ADONOC offshore - AL NASR Project , Abu Dhabi SIL Validation 2020
    Chevron Iraq Project, Iraq SIL Verification 2020
    KOC Desalter Project, Kuwait SIL Study 2020
    HAZOP Study - Cyclohexene Process Plant, Abu Dhabi HAZOP and SIL Study 2020
    SNOC - Moveyeid Gas Storage Surface Facility Project (Phase-2), Sharjah FGS Mapping Study 2020
    Habshan 5 Debottlenecking Project, Abu Dhabi SIL Study 2020
    Bu-Hasa Debottlenecking Project, Abu Dhabi SIL Study 2020
    Satah Compressor package, Abu Dhabi SIL Study 2019
    485 MBD Modification - BIFP, ADNOC Onshore, Abu Dhabi SIL Verification, Alarm Rationalisation 2021
    Diyab Upstream Project SIL Verification 2020
    SADAD, Oman FSA and SIL Validation 2020
    NASR 85 MBD Project, Abu Dhabi SIL Lifecycle Study -ESD and F&G (Event Tree Analysis) 2020
    ADNOC LNG Project SIL Study 2020
    Shah Sour Gas Field, Shah Gas Plant, ASG, Abu Dhabi Revalidation HAZOP &SIL 2020
    Bul Hanine (BH) oil field Re-Development, Qatar SIL Validation 2020
    Amine Sweetening Unit, GORU B Facility, Pakistan SIL Study 2020
    Shah Sour Gas Field, Shah Gas Plant, ASG, Abu Dhabi Alarm Rationalisation 2021
    P4 Plant FEED Project, Borouge, Abu Dhabi SIL and LOPA Study 2021
    Sulphur Handling RSHT, AGP, Abu Dhabi SIL Study - SIFPRO 2021
    AL NASR - FFD SIL Validation, UAE SIL Validation 2021
    ILF Boiler Pkgs AGP, UAE SIL Study - SIFPRO 2021
    Flare Gas Recovery - Habshan, UAE SIL Study - SIFPRO 2021
    Sales Gas Pipeline network enhancement, AGP, UAE SIL Study - SIFPRO 2021
    Habshan 0 Boiler Upgrade Project, UAE SIL Study - SIFPRO 2021
    LPG Import, Backflow & Loading Lines Replacement Project, SNOC, UAE SIL Study 2021
    UAD ESP Early Production Scheme, UAE SIL - Life cycle studies 2021
    Thamama F Trunklines-EPC Phase, UAE SIL Verification 2021
    Metering Packages, UAE SIL Study 2021
    Habshan 5 Pipeline Integrity Upgrade, AGP, UAE SIL Study 2021
    Balbazem Field Development, UAE SIL Study 2021
    Al Dhafra metering package, UAE SIL Study 2022
    Rumaila Project - Trunk Lines & Manifolds, Iraq SIL Study 2022
    RO DM Plant with ZLD & CPU- Petrochemical and Lube Integration Project “LuPech” (J-18)”, IOCL Gujarat Refinery, India SIL Study & Verification 2022
    Ruwais Capaity Enhancement of NGL Trains-1,2,3&4, UAE SIL Study and Verification 2022
    Upgrade of Existing Taweelah Gas Compressor Plant, UAE SIL Study and Verification 2022
    Jurassic Process Facility (JPF-5), Kuwait SIL Study 2022
    Safety Studies-Al Shaheen Field, Qatar SRS Development 2022
    Sour Gas Treatment Plant, Majnoon, Iraq SRS Development & SIL Verification 2022
    NCF-1 & 2 Modification, Tatweer, Bharain SIL Verification & SRS 2022
  • Project/Activity/Location Service rendered by SCE Year of Award
    SCADA for Utilities tunnel, Qatar CHAZOP 2012
    Taweela Compression Project - Vendor packages, UAE CHAZOP 2017
    Control System HAZOP for KOC GC-32, Kuwait CHAZOP 2018
    DUQM Refinery Package, EPC-2, Oman CHAZOP 2019
    Thai Oil refinery - Clean Fuel Project, Thailand CHAZOP 2020
    SPM Reliance Project, Honeywell, India CHAZOP 2021
    Balbazem Field Development, UAE CHAZOP 2021
    Khuff-2021 NAG wells & Pipeline Hook up, Bahrain Cyber Security Study 2021
    KBU-2022 Wellhead and GDU Modifications, Bahrain Cyber Security Study 2021
  • Project/Activity/Location Service rendered by SCE Year of Award
    ASAB Field Development Project, UAE Alarm Rationalization as per EEMUA 191 2011
    Turkmengas Gas Plant, Turkmenistan Alarm Rationalization as per EEMUA 191 2012
    Laggan - Tormore Gas Terminal Project, UK Alarm Rationalization Study 2012
    CPF-1 Facilities, Badra, Iraq Alarm Management Study 2013
    ADCO BAB Compression project Alarm Management Study, UAE Alarm Management Study 2014
    ZADCO UZ750 Island Project, UAE Alarm Management Study 2014
    Sohar Refinery Improvement Project SRIP, ORPIC, Oman Alarm Management Study 2015
    Umm Lu Lu Field Development, UAE Alarm Management and Hazard Study Study 2016
    SARB Project Package III, UAE Alarm Rationalisation Facilitation 2016
    Jazan Tank Farm Project, KSA Alarm Management Study 2017
    Bu Haseer AMHAZ Study, UAE Alarm Management Study 2017
    Fadhili Field Development, Saudi Aramco Alarm Management Study 2017
    NASR Phase II FFD Project, Abu Dhabi Alarm Rationalisation (AMHAZ) 2018
    NAG LTFD 3 Khuff Wells Surface Facilities Project, Bahrain Alarm Rationalisation 2018
    Sakalin OPF Compression project, Russia Alarm management Study 2018
    Salalah LPG Extraction project, Oman Alarm Rationalization 2018
    Turkstream Gas Pipeline Project, Turkey Alarm Rationalization 2018
    Bu Haseer FFD Project, Abu Dhabi Alarm Rationalization 2019
    NAG LTFD-3 Khuff Wells Surface Facility Project, Bahrain Alarm Management Study 2019
    DUQM Refinery Package, EPC-2, Oman Alarm Rationalisation 2019
    Qusahwira Phase-1 and 2, Abu Dhabi Alarm Rationalisation 2019
    ADNOC M Project, Fujairah Alarm Rationalisation 2020
    Khuff-2021 NAG wells & Pipeline Hook up Alarm Rationalisation 2021
    KBU-2022 Wellhead and GDU Modifications Alarm Rationalisation 2021
    BalBazem Alarm rationalsiation, UAE Alarm Rationalisation 2022
  • Project/Activity/Location Service rendered by SCE Year of Award
    ADCOP design verification project (JP Kenny) Engineering document review and site installation review 2010
    Dornier consulting GMBH / Artificial Recharge and Utilisation of the Groundwater Resources in the Liwa area PMC Support for Electrical / Instrumentation discipline 2011-2013
    Qaiwan refinery, Iraq, Comissioning assistance Supply of DCS Commissioning Engineer 2012
    SIL study implementation for Trains 1, 2 and 3 Updating of Operation Manual for Trains 1, 2 and 3 2011
    EPC for new fire training centre close to ASAB plant Detailed engineering for Electrical, I&C 2012
    Expansion and modernization of tank farm and production facilities (Germagulf-Jotun) Detailed engineering for Electrical, I&C, Piping and Mechanical 2013
    Umm Al Dalkh WHPs (various) addition of ESPs, Abu Dhabi Integration of control systems and commissioning support 2013-2015
    Sulphur Recovery Unit, Ruwais Refinery I&C Design and Engineering 2020-2021
    Bulk Storage Terminal Modification project, Petrochmical Plant, Taiwan Electrical and I&C engineering support 2022

Enquiry Form

Please fill in all details to serve you better